How to achieve different finishes on Natural Stone

Different finishes on natural stone

SEALING:                       LTP MATTSTONE                    500ml, 1 & 5ltr containers

LTP MATTSTONE (Natural Finish): Apply evenly to the surface using an applicator LTP-Mattstone5L,1L_500ml_Grp_Webpad or soft cloth.  Leave the sealer to absorb into the stone for 30 minutes.  Work into and then buff off any excess using a micro-fibre cloth. Apply further coats using the same method until the stone is fully saturated. Leave to cure overnight.  This should be done before grouting. Finish by applying a further coat of sealer making sure to cover the joints as well.

Buff off any excess sealer between coats…allow to dry for 24 hours before allowing heavy traffic.

SEALING:                       LTP STONEOIL                                    1 & 5ltr containers

LTP STONE OIL (Super Enhanced Finish) – Apply evenly to the surface using an applicator pad or soft cloth. Leave the sealer to absorb into the stone for 30 minutes. Work into and then buff off any excess using a micro-fibre cloth. Apply further coats LTP-StoneOil5LTin_1L_Grp_Webusing the same method until the stone is fully saturated. Leave to cure overnight. This should be done before grouting, followed by a second coat making sure to cover the joints as well. Blemishes and minor scratches when they occur can be treated with the application of a little more Stone Oil. For extra stain resistance in bathrooms and kitchens a thin layer of LTP Mattstone or Colour Intensifier can be applied over the Stone Oil.

SEALING:                    LTP COLOUR INTENSIFIER      500ml, 1 & 5ltr containers

LTP COLOUR INTENSIFIER & STAINBLOCK (Enhanced Finish) – Apply evenly to the surface using an applicator pad or soft cloth. Leave the sealer to absorb into the stone for 30 minutes. Work into and then buff off any excess using a micro-fibre cloth.LTP-ColourIntensifier5L_1L_500ml_Grp_Web Apply further coats using the same method until the stone is fully saturated. Leave to cure overnight. This should be done before grouting. Finish by applying a further coat of sealer making sure to cover the joints as well.

Buff off any excess sealer between coats…allow to dry for 24 hours before allowing heavy traffic.

IMPORTANT NOTES:
Over applied sealer left to dry on the surface can be removed with the application of a little more sealer, which should then be buffed immediately to remove the excess. If left for too long then removal can be achieved using LTP Power Stripper in which case surfaces will need to be re-treated.
This information is offered without guarantee.  The material should be used so as to take account of the local conditions and the surfaces to be treated.  In case of doubt, the products should be tried out in an inconspicuous area before general application.
Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s